The Field Journal

Specifications & Supplier Markets

How technical requirements shape competition, risk, variation, and the price a buyer ultimately pays.

Articles

18 articles
Nov 02

Count Who Finished Your RFP, Not Who You Invited

In a multi-category sourcing event one of our teams was running, the picture a week before the close date was this.

Oct 19

The Savings Your Plants Will Politely Decline

A supplier comes back on a packaging category with a concession split in two.

Oct 12

The Buffer Nobody Owned Until The Truck Was Late

A plant expected to shut down the lines that fill product because its film had not arrived.

Oct 07

The Quantity on Your Bid Is a Specification

A packaged food brand took two packaging categories to market, corrugated and folding carton, one supplier each.

Oct 01

The Conversion List Is Not the Savings List

I spent a call recently walking a packaging conversion list box by box with the operations contact who owns it.

Sep 30

A Product Model Is Not a Packaging Model

New product development hands packaging a set of files and a launch date.

Sep 28

Measure Before the Step You Cannot Undo

A cross-functional group sat down in a weekly review to walk a draft film testing procedure line by line.

Sep 25

You cannot negotiate a cost you do not buy

A materials advisor I work with opened a client call by telling me the round was over and it had produced nothing.

Sep 18

Your Supplier Booked the Savings, You Booked the Leakers

An edible-fats processor spent this summer chasing leakers.

Sep 15

A Quote You Cannot Award Is Not A Price

A protein processor told us plainly that it was not moving its flexible film supplier.

Sep 11

An Alternative Spec Has No Price Until You Ask

Two months ago I sat on a kickoff call with a Midwest protein processor and walked through how we would take their flexible film to market.

Sep 02

Back-Solve the Assumption Inside the Quote

An unusually low quote may be a good offer, a different scope or a misunderstanding. Before using it to size savings, work backward through the assumptions.

Aug 26

Review the Specification Before the Next Negotiation

A packaging price reflects requirements as well as supplier terms. Reviewing those requirements can reveal a different decision from another price negotiation.

Aug 14

Keep a Packaging Failure Investigable

When a package fails after a specification change, the change is a reasonable hypothesis. It is not a completed investigation.

Jul 30

Qualify the Pack in the Configuration That Ships

A component test answers the question it was designed to answer. It does not automatically validate every way a plant will pack, stack, store and transport that component.

Jul 20

Use a Flat Price as a Question, Not a Margin Verdict

A flat packaging price can deserve attention when a relevant input benchmark moves. The chart alone does not prove that the supplier's margin increased or that the buyer is owed a reduction.

Jul 02

Price the Recordkeeping Behind a Custom SKU

A custom SKU can carry a healthy gross margin while requiring work that the quote never priced. Someone must maintain its approved requirements, supplier options, change history and relationship to the products that use it.

Mar 22

Qualify the Ingredient Against the Process

Does an ingredient alternative change usable production performance even when it meets purchasing specifications?